January, 2014

Ein Bokek

Ein Bokek
  • Location: M.A. Tamar, Ein Bokek, Israel
  • Project Type: Design
  • Wastewater: Domestic
  • Volume: 3,500 m3/day



In 2014 Regional Authority "tamar" located near the Dead Sea initiate upgraded to their WWTP.

The plant handle wastewater of the all the Hotels in the area 3000-3500 m³/d.


  1. To meet the strict Requirements of the Israeli Health and Environmental Authorities
  2. Reuse of the treated wastewater for irrigation


Triple – T was chosen to design & support the operation. The upgraded included:

-          Upgrading the aeration system of the aerobic reactors.

-          New secondary clarifier (Third in the WWTP)

-          Full sludge treatment system including aerobic digestion, thickening and dewatering.

Estimated completion of upgrade - February 2016